Two Page
Executive Summary
Select SLIDE SHOW PRESENTATION of this project here.

note: these are screen shots from the complete project financials and details
available online at www.goldpactpower.com and a more detailed version of this page is available here.

Image 1: screen shot from page 3 of the Business Plan for this project and shows total funding request, installed capacity and anticipated earnings

Image 2 shows debt service is nearly complete in under 10 years. Typically wind farms require 12 - 15 years to complete debt service. By focusing revenue on the construction principle and carefully selecting windy locations, Gold Pact Power projects are capable of easily retiring debt early.

Image 3 shows projected monthly revenue for this project is roughly $4.5 million dollars per month.

Image 4 shows that through the life of the project, the reserve accounts are well funded.

Image 5 shows that even though the reserve accounts are funded and debt service is nearly complete, the Site Admin account has grown and holds nearly $50 million dollars.

The Journal and General Ledger used to produce these "Live Real-Time Financials" can be tuned to run to either increase Earnings Distribution or quickly reduce Debt.


The complete project financials and business plan show that throughout the project's life, earnings were withdrawn, turbines were well maintained and the project is very profitable, either as a Construction Loan or Debt Equity investment.


We have over $22 billion dollars in similar projects seeking funding.


All financials are based on double entry debit/credit accrual based banking standards. An investment banker who reviewed our system said "Wow! I have never seen such detail." Firms such as Edison hire Teams from Gold Pact to produce extremely accurate projections. Gold Pact has provided Audit, Operations and Maintenance, Construction Job Costing and Corporate Expansion Software for large multi-million dollar firms since 1983.


Engineering Reports are extremely detailed: right down the effect of Latitude (heat) on bearing wear.


"Gold Pact Power" was formed by a team of engineers with over 100 combined years in the Utility Grade Power Industry.

  • Our CEO, Craig Mead, spent his time in college working for a Law Clerk for a Retired Federal Judge and Judge Pro Tem. This experience has proven critical to designing contracts that have set the standard in the industry. "Our contracts and terms are copied heavily by our competitors. I suppose 'Piracy' is the best form of flattery."

    After college he wrote plant audit, MTBF analysis, maintenance and safety software for Edison's San Onofre Nuclear Generating Station and was trained by NASA Personnel on Wind Generator Airfoil Design, worked with staff from the U.S. Air Force and Mission Industries on Drive Train Design, with AC Delco on software to train astronauts and then with GE and the AWEA on developing wind farms.

    During that 20 year period he redesigned companies earning $10 to $50 million per year to reach $100 to $500 million in annual revenue and has helped firms grossing over $300,000,000 per month with A/P, A/R, Collections, Inventory Control, Plant and Fleet Maintenance, hiring the teams, documenting their jobs, training the teams and designing and coding all of the software to get the job done efficiently. One client has run a system billing $360 million a month. "It never crashes and for over 7 years, no human has ever touched a key."

    Running Gold Pact Software, firms such as the University of Phoenix tripled in size, growing from 7 to 21 campuses in under 3 years. Mission Industry went from 65 to over 200 plants in under 2 years.

    After working with an Air Force Test Pilot on measuring lift to drag ratios in wings, in 1990 he turned his attention towards manufacturing and utility sectors, redesigning software for large plants, generating stations and the nuclear industry. His first job for Edison was to stop the fines from the NRC. "Mission accomplished in under 3 months."

    With his training in air foil design for wind generators, background in law and designing reports to track wear on drive trains, using well designed reports and data to reduce expenses and bottlenecks, training one of the most effective teams in the industry to "Quickly Grow a Firm", he became a natural in the exploding wind farm industry. "While I was in Manhattan, three of our competitor approached our Team with bribes; one for $250,000. I again find this to be a compliment to our growth and influence and a testimonial to the loyalty and integrity of our crew."

    Gold Pact Power grew to $14 billion in signed contracts in our first year (third party audit).

  • Ms. Moss, V.P. "Operational Wind Farms" began working in the wind industry 20 years ago and is still valued by her clients and respected by other wind farm Admins. She has a wide spectrum of experience encompassing management of construction, expansion and day-to-day operations and Lead Site Admin. She ran the first profitable wind farm in the State of California and hasn't stopped running wind farm projects or advising other Admins since.

  • Mr. Zorne, V.P. "New Project Finance" has extensive experience in the International Banking sector and is a Master Electrician and Civil Engineering Contractor. Among his many accomplishments, has built transmission lines, substations and worked on mass transit terminals such as the San Francisco Airport Bart expansion.

  • In addition to Staff with Law and International Banking experience, if you're an Investor and have called our Corporate Office, you've probably spoken to our Vice President in charge of S.F. Corporate, Mr. Baxter ("Terry"). Terry has spent over a decade hand carring Millionaires, Attorneys, Mayors, Senators and Investor's "Wish Lists" from Point A to Point B, insuring what they've asked for is delivered with charming finesse and is exactly what was planned, ordered and then delivered.

  • Our Field Reps are locals, shaking hands with neighbors they've known for decades in rural communities all over the world. We're engineering community grids and wind farms for Mayors, County Supervisors, Senators and Governors and have written new energy law in foreign nations. We have one of the fastest growing Field Teams on Earth and if you know anyone looking for a job in this billion dollar industry, we'd love to hear from them.

  • Other engineers on staff have worked with teams from Edison, Bechtel, Westinghouse, the NRC, AWEA, IBEW, NECA, AWS, AC Delco, Mission Industries, Arm and Hammer, Comcast, Verizon, the University of Phoenix, Wadsworth/Thomson Learning, JBI and Gaastra Sails. Please take a moment to review our about page for more information surrounding our experience: over 100 combined years in Utility Grade Power. We've been building generating stations for over 30 years and working with wind power and designing audit systems and managing construction and operations for the utility industry for over two decades.

    We design our projects and purchase order sequence so your capital is well collateralized with GE turbines, making each Wind Farm developed with an experienced team and secured purchase orders a "Low Risk Bread and Butter" decision. Due to the backlog of customers waiting for turbines, purchase orders made with GE are very safe investments, especially when compared to Gold, Oil, Currencies and Other Commodity Investments We hope that you take a moment to review more details about this project or log in to our system and review complete financials and project details on a variety of wind farm, bio fuel and geothermal projects seeking funding.

    Thank you.