Two Page
Executive Summary
|
Select SLIDE SHOW PRESENTATION of this project here. |
note: these are screen shots from the complete project financials and details
available online at www.goldpactpower.com and
a more detailed version of this page is available here.
|
Image 1: screen shot from page 3 of the Business Plan
for this project and shows total funding request, installed
capacity and anticipated earnings
|  |
|
Image 2 shows debt service is nearly complete in under 10
years. Typically wind farms require 12 - 15 years to complete
debt service. By focusing revenue on the construction principle
and carefully selecting windy locations, Gold Pact Power
projects are capable of easily retiring debt early.
|  |
|
Image 3 shows projected monthly revenue for this project is roughly
$4.5 million dollars per month. |  |
|
Image 4 shows that through the life of the project, the reserve accounts
are well funded.
|  |
|
Image 5 shows that even though the reserve accounts are funded and
debt service is nearly complete, the Site Admin account has grown and
holds nearly $50 million dollars.
The Journal and General Ledger used to produce these "Live Real-Time Financials"
can be tuned to run to either increase Earnings Distribution or quickly reduce Debt.
|  |
The complete project financials and business plan
show that throughout the project's life, earnings were withdrawn, turbines were well maintained and
the project is very profitable, either as a Construction Loan or
Debt Equity investment.

We have over $22 billion dollars in similar projects seeking funding.

All financials are based on double entry debit/credit accrual
based banking standards. An investment banker who reviewed our
system said "Wow! I have never seen such detail."
Firms such as Edison hire Teams from Gold Pact to produce
extremely accurate projections. Gold Pact has provided Audit,
Operations and Maintenance, Construction Job Costing and Corporate
Expansion Software for large multi-million dollar firms since 1983.

Engineering Reports are extremely detailed: right down the
effect of Latitude (heat) on bearing wear.
"Gold Pact Power" was formed by a team of engineers with over 100
combined years in the Utility Grade Power Industry.
- Our CEO, Craig Mead, spent his time in college working for
a Law Clerk for a Retired Federal Judge and Judge Pro Tem. This
experience has proven critical to designing contracts that have
set the standard in the industry. "Our contracts and terms are
copied heavily by our competitors. I suppose 'Piracy' is the
best form of flattery."
After college he wrote plant audit, MTBF analysis, maintenance
and safety software for Edison's San Onofre Nuclear Generating
Station and was trained by NASA Personnel on Wind Generator
Airfoil Design, worked with staff from the U.S. Air Force and
Mission Industries on Drive Train Design, with AC Delco
on software to train astronauts and then with GE and the AWEA on
developing wind farms.
During that 20 year period he redesigned companies earning $10
to $50 million per year to reach $100 to $500 million in annual
revenue and has helped firms grossing over $300,000,000 per
month with A/P, A/R, Collections, Inventory Control, Plant and
Fleet Maintenance, hiring the teams, documenting their jobs,
training the teams and designing and coding all of the software
to get the job done efficiently. One client has run a system
billing $360 million a month. "It never crashes and for
over 7 years, no human has ever touched a key."
Running Gold Pact Software, firms such as the University of
Phoenix tripled in size, growing from 7 to 21 campuses in under
3 years. Mission Industry went from 65 to over 200 plants in
under 2 years.
After working with an Air Force Test Pilot on measuring lift to
drag ratios in wings, in 1990 he turned his attention towards
manufacturing and utility sectors, redesigning software for
large plants, generating stations and the nuclear industry. His
first job for Edison was to stop the fines from the NRC.
"Mission accomplished in under 3 months."
With his training in air foil design for wind generators,
background in law and designing reports to track wear on drive
trains, using well designed reports and data to reduce expenses
and bottlenecks, training one of the most effective teams in the
industry to "Quickly Grow a Firm", he became a natural in the
exploding wind farm industry. "While I was in Manhattan, three of
our competitor approached our Team with bribes; one
for $250,000. I again find this to be a compliment to our
growth and influence and a testimonial to the loyalty and integrity of our
crew."
Gold Pact Power grew to $14 billion in signed contracts in our
first year (third party audit).
- Ms. Moss, V.P. "Operational Wind Farms" began working in the wind industry
20 years ago and is still valued by her clients and respected by other
wind farm Admins. She has a wide spectrum of experience
encompassing management of construction, expansion
and day-to-day operations and Lead Site Admin. She ran the first
profitable wind farm in the State of California and hasn't stopped
running wind farm projects or advising other Admins since.
- Mr. Zorne, V.P. "New Project Finance" has extensive experience in the
International Banking sector and is a Master Electrician and Civil Engineering
Contractor. Among his many accomplishments, has built
transmission lines, substations and worked on mass transit terminals such as
the San Francisco Airport Bart expansion.
- In addition to Staff with Law and International Banking
experience, if you're an Investor and have called our Corporate
Office, you've probably spoken to our Vice President in charge
of S.F. Corporate, Mr. Baxter ("Terry"). Terry has spent over a
decade hand carring Millionaires, Attorneys, Mayors, Senators
and Investor's "Wish Lists" from Point A to Point B, insuring
what they've asked for is delivered with charming finesse and is
exactly what was planned, ordered and then delivered.
- Our Field Reps are locals, shaking hands with neighbors
they've known for decades in rural communities all over the
world. We're engineering community grids and wind farms for
Mayors, County Supervisors, Senators and Governors and have
written new energy law in foreign nations. We have one of the
fastest growing Field Teams on Earth and if you know anyone
looking for a job in this billion dollar industry, we'd love to
hear from them.
- Other engineers on staff have worked with teams from
Edison, Bechtel, Westinghouse, the NRC, AWEA, IBEW, NECA, AWS,
AC Delco, Mission Industries, Arm and Hammer, Comcast, Verizon, the University of
Phoenix, Wadsworth/Thomson Learning, JBI and Gaastra Sails. Please
take a moment to review our
about page for more information
surrounding our experience: over 100 combined years in Utility Grade
Power. We've been building generating stations for over
30 years and working with wind power and designing audit systems
and managing construction and operations for
the utility industry for over two decades.
We design our projects and purchase order sequence so
your capital is well collateralized with GE turbines,
making each Wind Farm developed with an experienced team
and secured purchase orders a "Low Risk Bread and Butter" decision.
Due to the backlog of customers waiting for turbines, purchase orders made with GE are very safe investments, especially
when compared to
Gold, Oil, Currencies and Other Commodity Investments
We hope that you take a moment to review
more details about
this project or log in to our system and
review complete financials and project details on a variety of wind farm,
bio fuel and geothermal projects seeking funding.
Thank you.
|


|
|